GreenPin  
Type :    
Available


Shackles




Shackle SC یک شگل با پین پیچ دار است. پین پیچ مونتاژ سریع (جدا کردن) را امکان پذیر می کند که باعث می شود غل برای فعالیت های دکلینگ که در آنها مونتاژ و جداسازی قطعات نسبتاً مکرر اتفاق می افتد عالی باشد. Green Pin ® Bow Shackle SC را می توان برای هر دو سیستم یک پا و چند پا استفاده کرد. به دلیل گالوانیزه بودن غل، دوام طولانی مدت آن تضمین شده است. طراحی غل، سایش طناب (سیمی) را کاهش می دهد زیرا رزوه پیچ در یک محفظه پنهان شده است. Green Pin ® Bow Shackle SC که برای استفاده در خارج از ساحل بسیار مهم است، با طیف گسترده ای از گواهینامه های جوامع طبقاتی مانند DNV GL مطابقت دارد. قلاب در محدوده ای با محدودیت بار کاری از 0.33 تا 55 تن موجود است.

Conditions
Since the shackle has an important task in lifting joints, unlike its simple shape, it has a complex manufacturing process.
The body of the shackle is made of forged integrated steel without any welding.
The pin is made of forged and machined steel rods.
Then the heat treatment on the jaws is done by one of the following methods:
Heat to 50 ° C above the critical point of the steel and then cool in the open air.
Heat to 50 ° C above the critical point of the steel and then place in water or oil at 550 to 660 ° C.
According to BS standard, shackles that have been hardened and heat treated
In the arc of the job, code 04 or 06 is marked as a quality mark on it.
The factory is obliged to provide the buyer with a technical health certificate with the job.
All jobs that have been heat treated and hardened
They must be tested for Proof Test, which must be performed by an experienced inspector.
To prevent rust and corrosion, the forged steel is covered with a galvanized coating of zinc or cadmium.
The size of the jaws is determined by the diameter of their body.
Jacks are widely used in loading operations and must be carefully used and inspected.
According to the standard, the manufacturers of the job are obliged to permanently engrave the following items legibly on the body of the job:
1 - Manufacturer's name (its brand)
2 - Shoggle size
3 - Permitted capacity of the job (SWL)
In most jobs, the pin is screwed directly into the eye hole of the job.
It should be noted that non-screw pin jobs can usually withstand the lateral pressures of the load to lift the load vertically.
Occasionally there is a chip with screws and nuts
These jaws are used for places where the jig does not need to be opened and closed frequently
In other words, these jobs are used for long and permanent installations.

TEL : 021-55414945 | 55787225
Fax : 021-55414946
Email: power_boksel [at] yahoo [dot] com
Web: www.powerboksel.ir

© Copy right 2024 | All ights Reserved | Power Boxel Corporation